New YRM supplied drivers footwell repair panel installed and U-POL Grey Stripe seam sealer painted ready for painting
Friday, 5 September 2014
Tuesday, 2 September 2014
Reconditioned battery box
In preparation for the welding I removed the ancillary battery from the battery box. On inspection it looked a bit messy in the bottom of the box so decided to remove both batteries to see if there were and holes.
After clearing the mud, leaves and sticks, followed by a good wash out and wire brushing, it looked very solid.
Quick coat of Hammerite Kurust anti-rust solution and gloss black smooth-rite and it's ready to receive the batteries again.
Next job will be to fit extended grommet tubes to stop water getting in. These will be a home made solution created from large washers and bicycle inner tube.
After clearing the mud, leaves and sticks, followed by a good wash out and wire brushing, it looked very solid.
Quick coat of Hammerite Kurust anti-rust solution and gloss black smooth-rite and it's ready to receive the batteries again.
Next job will be to fit extended grommet tubes to stop water getting in. These will be a home made solution created from large washers and bicycle inner tube.
Subscribe to:
Posts (Atom)